Project Logbook — April 2025 to December 2025

Phase I — Initial Technical Validation (Q2 2025)

April 2025 — Base Infrastructure Validation

The first round of system-level tests for TokenGød is completed. The contract responds reliably and the oracle begins tuning. First real logs are generated, preparing for full functional testing.

May–June 2025 — Functional Ecosystem Testing

A two-month full functional test validates all ecosystem operations prior to deployment on Binance Smart Chain. Contracts, governance, microburn mechanics, and stress-tested oracle simulations are all tested thoroughly.

Phase II — Consolidation and Strategic Funding (Q3 2025)

July 2025 — Final Deployment Preparation

Following successful testing, mainnet deployment preparation begins. Community participation channels are enabled and incentive systems are calibrated.

August 2025 — Funding Rounds

Private and strategic funding rounds are launched to inject liquidity and support ecosystem infrastructure. The focus remains on long-term aligned partners.

September 2025 — Ecosystem Goes Live

The TokenGød ecosystem launches on BSC: contracts are deployed, nodes go live, wallet integrations begin, and real oracle activity starts flowing.

Phase III — Expansion and Compliance (Q4 2025)

October 2025 — Listings on Decentralized Exchanges

First listings on DEXs take place, enabling open circulation of TGD in DeFi markets. The community begins trading and interacting with live liquidity pools.

November 2025 — Legal and Regulatory Compliance

Legal frameworks are solidified under MiCA and GDPR. Contracts are audited, policies refined, and international legal resilience is reinforced.

December 2025 — Centralized Listings and Functional Ecosystem

With the legal structure in place, initial listings on centralized exchanges are executed. TokenGød closes the year as a fully functional, deflationary, distributed ecosystem ready for growth.